Installation Instructions; Step 1. Check The Packing List; Step 2. Mount The Switch - Qlogic 12000 Series Quick Start Manual

Hide thumbs Also See for 12000 Series:
Table of Contents

Advertisement

Installation Instructions

This guide describes the steps to install and activate a 12000-series InfiniBand switch. For detailed instructions, refer
to the QLogic 12000 Hardware Installation Guide.

Step 1. Check the Packing List

Verify all ordered equipment has been received. The 12000 switches ship with all components pre-installed. The following
table lists the maximum configuration of installed components for each switch:
Component
Fans
Power Supplies
or Blank Fillers
IB Leaf Modules/
Blanks
Spine Modules/
Blanks
Management
Modules/
Blanks
Hardware
Installation kit
(mounting rails,
etc.)
DB-9 to RJ-11
adapter
RJ-11 Serial
1 (Managed
cable
Power Cords

Step 2. Mount the Switch

Install applicable rack mounting hardware and switch in a standard 19" rack as described in the QLogic 12000 Hardware
Installation Guide.
QLogic 12000
Quick Start Guide
Table 1. 12000-Series Components
12200
12300
N/A
N/A
N/A
2
Power/ Fan units
N/A
N/A
N/A
N/A
N/A
N/A
1
1
N/A
N/A
1
only)
2
2
12800-040
12800-180
4 Intake
5 Intake
3 Exhaust
4
6
4
18
1
5
2
2
1
1
2
2
2
2
4
6
12800-360
10 Intake
10 Exhaust
12
36
9
2
1
2
2
12
3

Advertisement

Table of Contents
loading

Table of Contents