A
Installation Tasks
1. If applicable, remove the doors of the rack.
2. Install the clip nuts Install M6 clip nuts in the following locations on EIA rails:
For improved stability, orient the clip nuts as shown (i.e., orient the flanges
horizontally):
D000140-001 B
Figure 1-12 Clip Nut Installation Locations
Figure 1-13 Clip Nut Orientation
Installation
12800-120 Installation
1-17