Figure 6-19 Hot-Swappable I/O Chassis Fans Removal and Replacement
IMPORTANT:
When one fan unit is removed from the server, the remaining fan units
operate at full speed. Operation will continue until an overtemperature condition is detected.
If an overtemperature condition occurs, the server shuts down.
4.
Repeat the same process for removal and replacement of the hot-swappable power supply
chassis fan.
Hot-Swappable Chassis Fan Unit
173