Appendix A: Calibration

Verification test requirements

Be sure that you perform the verification tests:
Under the proper environmental conditions.
After the specified warm-up period.
Using the correct line voltage.
Using the proper test equipment.
Using the specified output signal and reading limits.
Product specifications are subject to change. Listed uncertainties and test limits are provided only as
examples. Always verify values against actual product specifications.
Environmental conditions
Conduct your performance verification procedures in a test environment with:
An ambient temperature of 18 °C to 28 °C.
A relative humidity of less than 70 percent unless otherwise noted.
Product specifications that are listed as 18 °C to 28 °C assume adjustment has been done at 23 °C.
If the Series 2600B is adjusted at a different temperature, the specifications apply to ±5 ºC of that
adjustment temperature.
Line power
The Series 2600B requires a line voltage of 100 V to 240 V and a line frequency of 50 Hz or 60 Hz.
Perform verification tests within this range.
Warmup period
Allow the Series 2600B to warm up for at least two hours before conducting the verification
procedures.
If the instrument has been subjected to temperature extremes (those outside the ranges stated
above), allow additional time for the instrument's internal temperature to stabilize. Typically, allow one
extra hour to stabilize an instrument that is 10 °C outside the specified temperature range.
Allow the test equipment to warm up for the minimum time specified by the manufacturer.
A-2
Series 2600B System SourceMeter® Instrument Reference Manual
2600BS-901-01 Rev. E / January 2019

Advertisement

loading
Need help?

Need help?

Do you have a question about the KEITHLEY System SourceMeter 2636B and is the answer not in the manual?

Subscribe to Our Youtube Channel