Operations; Power Up The Server; Power Down The Server; Extend The Chassis From The Rack - HPE ProLiant XL645d User Manual

Gen10 plus server
Table of Contents

Advertisement

Operations

Power up the server

To power up the server, use one of the following methods:
Press the Power On/Standby button.
Use the virtual power button through iLO.

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical server data
and programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If an
application stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through iLO 5.
This method initiates a controlled remote shutdown of applications and the OS before the server enters standby
mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is amber.

Extend the chassis from the rack

Procedure
Loosen the thumbscrews on either side of the chassis, and then extend the chassis from the rack.
26
Operations

Advertisement

Table of Contents
loading

Table of Contents