Appendix D: Options; Mb02R96 Peak Meter Bridge - Yamaha 02R96 Owner's Manual

Digital mixing console version 2.0
Hide thumbs Also See for 02R96:
Table of Contents

Advertisement

Appendix D: Options

MB02R96 Peak Meter Bridge

Installation
1
Unscrew the four fixing screws
meter bridge will be attached.
1
Using the four supplied 8 mm screws
2
bridge, as shown below.
3
Align the meter bridge with the 02R96, and, using two of the supplied
12 mm screws
fully.
Screw in the bottom two screws
4
Fully tighten the top two screws
5
Connect the meter bridge cable to the 02R96's METER port.
6
3
1
on the 02R96 rear panel to which the
C
, screw in the top two fixing screws, but don't tighten them
C
and tighten them fully.
C
.
2
3
MB02R96 Peak Meter Bridge
B
, attach the brackets to the meter
2
02R96 Version 2—Owner's Manual
335
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

O2r 96 version 2

Table of Contents