Connections - Pentair E-Box INTELLIPOOL Installation And Operation Manual

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
Info
The quick-connect cables are connected to the bottom of theE-Box (7).
Install the cable ducts provided according to the diameter and number of cables used.
The cable ducts prevent moisture or acid vapour from entering the device. Never leave an
empty hole unused without protection. See the chapter Connections [
4.8.2

Connections

34 / 102
4
INTELLICHLOR
Cell connection
INTELLIPOOL
Power supply connector
Data connector
Control connector 1
Control connector 2
5
6
7
28/04/17 15: 23 :4 8
Water temp.: +2 9. 0° C
pH:7,8
O RP :6 07 mV
Cond:5264uS
3 .2 8g /l
Data link connector
Ref. SB-CU-IMP-058EBA / A - 11.05.2023
Page 34].

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intp-1010c

Table of Contents