Pentair E-Box INTELLIPOOL Installation And Operation Manual page 52

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
Connecting a 3-way valve to the Control Centre (for fountain triggering...)
1. Connect the valve according to the diagram below.
2. In the menu "Pool Properties > Menu Installation 4X Extension", see Menu installation 4X
Extension [
Page 47], select the output "Aux 4" and customise the name if necessary.
Connecting a UV sterilizer
1. Connect the UV tube according to the diagram below by choosing the dedicated output (AUX4,
AUX5).
2. In the "Pool Properties > Menu Installation 4X Extension" menu, see Menu installation 4X
Extension [
Page 47], select the output AUX 4 "Si filtration ON" and customise the name if
necessary. The UV sterilizer is active as soon as the main filtration works.
Connection of secondary lighting (garden, atmosphere) with a power of less than 1600 W
Info
The main pool lighting must be connected directly to the E-Box.
1. Connect the lighting according to the diagram below.
2. The operation of this lighting control will be the same as that of the swimming pool lighting
through the terminal blocks 21-22.
52 / 102
Dry contact terminal blocks 27-28
Neutral
Earth
Phase (L)
Neutral (N)
Terminal blocks 230V 13-14
13 14
Phase
Ref. SB-CU-IMP-058EBA / A - 11.05.2023
Earth

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intp-1010c

Table of Contents