Installation Of Probes - Pentair E-Box INTELLIPOOL Installation And Operation Manual

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
2
Install the probes in the analysis chamber
having previously removed the lower part
(the transparent bowl) of the analysis
chamber.

Installation of probes [

3
Install the analysis chamber according to
the diagram and limit the flow rate in
order to fill it slowly (filling in 1 minute).
Then leave this adjustment of the passage
of the water in the analysis chamber.
4.9.3
Installation of probes
Installation of measurement probes in the analysis chamber (provided):
CAUTION
Filling of the probes with potassium chloride
Risk of splashing on skin, eyes and clothing
• Handle with care
• Do not ingest
Mandatory
The probe tubes are filled with potassium chloride.
If you want to reuse them, fill them again with potassium chloride or in the absence of
running water.
Risk of damage to probes.
Mandatory
The conductivity probe pin should not be used for other probes.
42 / 102
Page 42]
5
The Probe Unit comes with a probe to
measure water temperature. A second
probe (optional) can be installed to
measure the air temperature.
For better accuracy of the water
temperature sensor, install the before
pump filtration.
For better accuracy of the air
temperature probe, install the away from
the sun.
Installation of probes [
Ref. SB-CU-IMP-058EBA / A - 11.05.2023
Page 42]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intp-1010c

Table of Contents