Pentair E-Box INTELLIPOOL Installation And Operation Manual page 36

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
1. High voltage connection (230V)
1
Terminal block 1: High voltage
connection (230V) [
230V minimum power compatible cables
5 mm
Minimum dry contact compatible cables
5 mm
4.8.2.1
Terminal block 1: High voltage connection (230 V)
Positions and markings of the connection terminals:
N-L1
E-Box Main Power Supply (230 V)
36 / 102
2. Low voltage connection (12/24V)
Page 36]
= R02V (3x1.5mm² min)
= R02V (3x1.5mm² min)
2
Terminal block 2: Low voltage
connection (12-24 V) [
Ref. SB-CU-IMP-058EBA / A - 11.05.2023
Page 37]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intp-1010c

Table of Contents