Pentair E-Box INTELLIPOOL Installation And Operation Manual page 46

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
4.9.4.2
Control Centre connections
Connections to be made to the Control Centre box, through the fast cables (provided).
Info
No internal connections in the Control Centre cabinet
4.9.4.3
Connections of the probes (pH + RedOx + conductivity + temperature)
1. Unscrew the cable gland completely: be careful not to drop the black flexible seal.
2. Pass the 4 cables through the nut and the cable gland.
3. Connect each terminal according to the indication under each terminal block.
4. Screw with a 2.5 mm slot screwdriver to 0.5-0.6 N.m.
5. Tighten the cable gland tightly by hand.
46 / 102
Connector cable 2 connected to the E-Box
Intellipool power supply cable connection to the E-Box
220V
Connector cable 1 connected
with the E-Box
Connection with Probe Unit
CONTACT INFO cable
Connection with the E-Box
Ref. SB-CU-IMP-058EBA / A - 11.05.2023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intp-1010c

Table of Contents