Pentair E-Box INTELLIPOOL Installation And Operation Manual page 51

Table of Contents

Advertisement

Terminal block 27-28 (by dry contact)
Phase (L)
Earth
Neutral (N)
Connecting an additional pump or apparatus >12A at 230V
1. Connect it according to the diagram below on the output AUX 3 terminal blocks 11-12.
2. In the menu "Pool Properties > Menu Installation 4X Extension", see Menu installation 4X
Extension [
Page 47], select the output "filtration" if you wish to activate it during pool
filtration and customise the name if necessary.
Connecting a Pneumatic Push/Pull Valve for Filter Washing
1. Connect the valve according to the diagram below.
2. In the menu "Pool Properties > Menu Installation 4X Extension", see Menu installation 4X
Extension [
Page 47], select the output AUX  4 "Filter Wash" and customise the name if
necessary.
Ref. SB-CU-IMP-058EBA / A - 11.05.2023
Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
Earth
Terminal block 27-28 (by dry
contact)
Terminal blocks 13-14 (by 230V power
supply)
24 V
Terminal blocks 13-14 (by 230V power
supply)
Earth
13 14
pH -
pH+
51 / 102

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intp-1010c

Table of Contents