Hydraulic And Electrical Installation - Pentair E-Box INTELLIPOOL Installation And Operation Manual

Table of Contents

Advertisement

4.9.2

Hydraulic and electrical installation

The diagram below illustrates the electrical and hydraulic connections of the Probe Unit with the
analysis chamber.
Mandatory
It is imperative to isolate the bypass by closing both valves before changing a probe.
Risk of flooding.
Earth
4
1
The probe cables must not cross the
power cable (risk of interference) or be
wound on themselves.
Ref. SB-CU-IMP-058EBA / A - 11.05.2023
Installation and Operation Guide Version E-Box INTELLIPOOL - Installation
1
3
4
2
Ø10 mm
5
The hydraulic network must be connected
to earth by means of a device validated by
an electrician so as not to alter the
reading accuracy of the probes.