Keysight E4980A/AL Precision LCR Meter
User's Guide
1
Unpacking and Preparation
This chapter describes how to set up and start the Keysight E4980A/AL
Precision LCR Meter.
Contents of this Chapter
-
-
-
-
-
Checking the Shipment on page?
After you receive the E4980A/AL, check all the items in the packing container.
Preparation before Use on page?
Shows how to check the power supply as well as check and connect the power
cable. This section also describes how to deal with a blown fuse.
How to Remove the Handle on page?
Shows how to attach and remove the handle.
Environmental Requirements on page?
Describes the system requirements needed to install the E4980A/AL and how to
secure space for heat radiation.
Starting the E4980A/AL on page?
Describes how to turn on/off the power switch and cut off the power supply.
17