9 Commissioning
10. If the displayed firmware version is different, contact Service.
DHCP protocol disabled or enabled
11.
Performing the next step depends on whether the DHCP protocol for the inverter's battery communication
interface is enabled or disabled.
12. If the DHCP protocol is disabled on the battery management
system and the IP address is specified, set the IP address of the
battery management system to 192.168.12.130 during
commissioning of the inverter.
13. If the DHCP protocol is enabled on the battery management
system and the IP address is variable, do not make any changes
to the configuration of the battery communication during
commissioning of the inverter. The default battery communication
settings will be automatically used.
14. Activate the next menu item. To do this, tap with the fingers on the highlighted area beside the display.
☑ The display changes from the Status to INIT mode.
☑ The SWITCH control element flashes.
15. Commission the inverter.
☑ Once commissioning of the inverter is complete, the display changes from the Status to PRECH mode. This
indicates that precharging mode of the battery has started.
☑ Precharging mode is complete once the display changes from the Status to OK mode. The battery is now
ready for operation.
Also see:
• Checking the Mounting and Connection Work ⇒ page 89
• Design of the Battery Cabinet ⇒ page 36
• Connection Area of the Battery Management System ⇒ page 75
• Commissioning the Inverter ⇒ page 90
• Safety when Commissioning the Battery ⇒ page 92
• Wiring of the Battery Modules ⇒ page 78
• Battery Event Messages ⇒ page 152
9.4.7

Commissioning Secondary Battery Cabinets

Order for commissioning the individual battery cabinets
In the battery cabinet order, each secondary battery cabinet is assigned a specific position. The battery cabinets
are commissioned in the opposite order. If there are three secondary battery cabinets, for example, the procedure
is as follows:
• First, commission the third secondary battery cabinet.
• Next, commission the second secondary battery cabinet.
• Finally, commission the first secondary battery cabinet.
Performing system registration
To complete commissioning, a system registration must be performed
• Use the following link for the system registration: https://my.sma-service.com/.
96
ESSX-20-SH-en-10
SMA Solar Technology AG
System Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commercial storage solution 50Essx-30-20Essx-50-20

Table of Contents