Performing Basic Configuration of the Sunny Island

Requirements:
☐ The Sunny Remote Control must be connected to the master.
☐ All Sunny Island inverters must be switched on but not in operation (for how to switch on the Sunny Island inverter,
see the Sunny Island inverter operating manual).
☐ The Quick Configuration Guide (QCG) is started.
Procedure:
1. Turn the button on the Sunny Remote Control to the right and
select New System.
2. Press the button.
3. Turn the button to the right until Y flashes and press the button. This confirms your selection of New System.
4. Set the parameters of the QCG (carry out basic configuration in accordance with the installed system, see quick
reference guide of the installed system).
8.1.3
Setting Sunny Island for Charge Controller / Sunny Island Charger in
Off-Grid Systems
Requirement:
☐ For systems with a maximum of four Sunny Island Charger devices, all Sunny Island Charger devices must be
connected to the master via a communication bus.
Procedure:
1. Log in to the communication product as Installer (see the user manual of the communication product) or switch to
expert mode on the Sunny Remote Control (see the Sunny Island operating manual).
2. Select the parameter Type: other DC sources / 250.28 ChrgCtlOp and adjust as follows:
Value
Auto
SMA
NoFrq
8.1.4

Commissioning the Battery Current Sensor in Off-Grid Systems

To operate the battery current sensor, you must set the type of the battery current sensor and start the
adjustments of the battery current sensor.
The Sunny Island distinguishes between battery current sensors of the types 50 mV and 60 mV. The types reflect the
amplification factor of the battery current sensor. The amplification factors are given in amperes per 50 mV or in
amperes per 60 mV, e.g., 400 A/60 mV.
Requirement:
☐ The Sunny Remote Control must be connected to the master.
Installation manual
Explanation
System with AC sources (e.g., PV inverter)
The Sunny Island Charger or charge controller can also be present in the system.
System with Sunny Island Charger and without AC sources
A maximum of four Sunny Island Charger devices is installed.
System with charge controllers and without AC sources
The charge controllers are not Sunny Island Charger devices or the number is greater than four
Sunny Island Chargers.
SI30M-44M-60H-80H-IA-en-32
8 Commissioning
69