Installing The Battery Management System - SMA COMMERCIAL STORAGE SOLUTION 30 System Manual

Table of Contents

Advertisement

SMA Solar Technology AG
8. Attach the supplied fixing brackets to the cabinet cover. Use two
of the four fastening screws on the cabinet cover for this.
9. Tighten all fastening screws on the cabinet cover (TX55, torque: 20 Nm to 35 Nm).
10. Attach the battery cabinet fixing brackets to the wall. Use two
screws suitable for the mounting base for this.
11. For each mounting level in the battery cabinet, attach four of the
supplied cage nuts to the sliding rails.
12. Attach the type label to a side panel on the battery cabinet where it will be clearly visible.
13. Attach the battery room label to the access door for the battery room where it will be clearly visible.
Also see:
• Transporting the battery ⇒ page 40
• Requirements for the Battery Installation Site ⇒ page 47
• Recommended Battery Mounting Clearances ⇒ page 48
• Battery Cabinet Mounting Dimensions ⇒ page 47
7.6.2

Installing the battery management system

Danger to life due to electric shock due to touching live components or cables with insufficient
or no grounding
If there is insufficient or no earthing, high voltages can be present at the battery cabinet enclosure in the event of a
fault. Touching live parts and cables results in death or lethal injuries due to electric shock.
• Earth the battery cabinet.
• Earth the battery management system during installation.
Performing system registration
To complete commissioning, a system registration must be performed
• Use the following link for the system registration: https://my.sma-service.com/.
System Manual
7 Mounting and Preparing the Connection
DANGER
ESSX-20-SH-en-10
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Commercial storage solution 50Essx-30-20Essx-50-20

Table of Contents