IBM eserver 630 6C4 Service Manual page 519

Table of Contents

Advertisement

9. Loosely thread one of the rail retaining screws into the rail's bottom screw hole.
This is the screw hole located one position below the bottom alignment pin.
Attention:
To install the rack rails correctly, you must read, then perform each
procedure step in the order given. Failure to do so may cause rail failure resulting
in system drawer damage or bodily injury.
10. Locate one of the latch brackets and place the bottom slot of the latch bracket
over the rail retaining screw. Finger-tighten the screw.
11. Finger-tighten a second retaining screw through the top screw hole of the
latch-bracket. After the latch bracket is in place, ensure that both screws are
finger-tight.
Attention:
Do not tighten any of the screws more than finger-tight until instructed
to do so. Tightening the screws prevents the rails from self-aligning when the
system drawer is attached.
12. Repeat steps 6 through 13 when installing the left rail. After both rails have been
installed, ensure that none of the rail's front retaining screws are more than
finger-tight. The rails must be level from front to back and from left to right.
1 Front Slide Rail Alignment Pin
2 Retaining Screws
3 Latch Bracket
Appendix D. Setting Up the System
499

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eserver 630 6e4

Table of Contents