Air Circulation Control; Watering System - Webasto DVS100 Installation, Operation And Maintenance Manual

Mhe intelligent fast charging systems
Hide thumbs Also See for DVS100:
Table of Contents

Advertisement

5.11.10 Air Circulation Control

NOTE: This section is only applicable if an Air Pump System has been installed and
connected to the charger.
The Air Circulation Control menus allow the user to set the Air Circulation control parameters.
From this menu, the charger Air Circulation Control can be Enable.
From the "Air Circulation Control" screen Press <enter> and then Press <enter> again and the
status (Enable or Disable) will flash. Press <up> or <down> to toggle between ON and OFF.
Press <enter> again to accept your selection. Press <clear> to exit.
CLEAR

5.11.11 Watering System

Allows the user to configure the charger to use any one of several pre-determined watering
systems or to set up a custom watering profile that allows the user to program the duration of the
watering period. The watering system, when active, is always set to turn on two hours into the EQ.
From the "Watering System Configuration" screen, press <enter> to display the Water System
Configuration status. Press <enter> again to enable editing. Use the <up> and <down> buttons to
toggle between "ON" and "OFF" and press <enter> to accept edits. Use the <select> button to
cycle through the remaining screens. To set Watering System Type Press <enter> again to enable
editing. Use the <up> and <down> buttons to toggle between the different types of Watering
Systems and press <enter> to accept edits.
If you have selected the Watering System Type "Custom Mode", you will be able to edit the "ON
Time" and you will be able to perform a watering system test. In "Custom Mode" press <enter>
again to enable editing of the "Valve Turn On Time". Use the <up> and <down> buttons to set ON
time "00:00 MIN" and press <enter> to accept edits. Once editing is complete, use the <clear>
button to return to the "Water System Type" screen. From this screen, press <select> to enter the
"Water System Test" screen. From this screen press <enter> to run the water test. There will be a
30 second count down and then watering will begin. Press the <stop> button to end the test.
Press the <clear> button to exit.
20182-W-03-01
IMPORTANT INFORMATION – SAVE THESE INSTRUCTIONS
Air Circulation
Control
ENTER
CLEAR
Air Circulation
Disable
Air Circulation
Enable
Figure 5- 22 Air Circulation Control Setup
DVS100 Installation, Operation and Maintenance
CLEAR
ENTER
ENTER
37
Charger Configuration
Verify Air Pump
Connection
CLEAR
Webasto Charging Systems, Inc.

Advertisement

Table of Contents
loading

Table of Contents