1 Getting Started
Before you begin, take the time to familiarize yourself with the Cautions in Section 2, and read the
installation instructions in Section 4 completely before you install your new DVS100.
To get your system up and running quickly perform the following steps:
1. Ensure the DVS100 siting requirements are followed. (Sections 4.5)
2. Connect the 3 phase utility power to the DVS100, and apply power to the DVS100.
(Sections 4.6)
3. Install the BMID onto the battery pack. (Sections 3)
4. Once the BMID is installed, the battery pack may be connected to the charger.
5. If your BMID does not come pre-configured, you will need to initialize the new BMID. (Refer to BMID
programming, document #06701-W-03)
Once the BMID has been properly programmed, the battery pack is ready to begin charging.
6.
20182-W-03-01
IMPORTANT INFORMATION – SAVE THESE INSTRUCTIONS
DVS100 Installation, Operation and Maintenance
1
Webasto Charging Systems, Inc.