Installing A Rear Serial Port Interface - HPE ProLiant DL385 User Manual

Table of Contents

Advertisement

7.
Install the server into the rack.
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10. Power up the server.
The installation is complete.

Installing a rear serial port interface

If a tertiary riser cage is installed, you can install the serial port into slot 6.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
Procedure
1.
Power down the server.
2.
Do one of the following:
Disconnect each power cord from the power source.
Disconnect each power cord from the server.
3.
Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
4.
Remove the access panel.
5.
If a tertiary riser cage is not installed, perform the following steps:
a. Remove the serial port blank.
Hardware options installation
135