10. Install the universal media bay.
11. Connect the power and data cables.
12. Install the access panel.
13. Slide the server into the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server.
The installation is complete.
Installing a midplane 4LFF SAS/SATA drive cage
Observe the following:
81
Hardware options installation