HPE ProLiant DL385 User Manual page 85

Table of Contents

Advertisement

The front drive bays are fully populated with 12 LFF or 24 SFF drives.
High performance fans are installed in all fan bays.
Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
4.
Remove the access panel.
5.
Do one of the following:
For primary bays, remove the riser cage.
For secondary bays, remove the rear wall blank.
Hardware options installation
85

Advertisement

Table of Contents
loading

Table of Contents