The installation is complete.
Riser and riser cage options
Installing primary and secondary risers
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
•
The components included with the hardware option kit
•
T-10 Torx screwdriver
Procedure
1.
Power down the server.
2.
Do one of the following:
•
Disconnect each power cord from the power source.
•
Disconnect each power cord from the server.
3.
Do one of the following:
Extend the server from the rack.
•
Remove the server from the rack.
•
4.
Remove the access panel.
5.
Remove the riser cage.
6.
Remove the riser board.
7.
Install the riser.
Hardware options installation
108