HPE ProLiant DL385 User Manual page 95

Table of Contents

Advertisement

CAUTION: If installing a processor with a faster speed, update the system ROM before installing the
processor.
To download firmware and view installation instructions, see the Hewlett Packard Enterprise Support
Center website.
CAUTION: THE CONTACTS ARE VERY FRAGILE AND EASILY DAMAGED. To avoid damage to the socket
or processor, do not touch the contacts.
2.
Power down the server.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
5.
Remove the access panel.
6.
Do one of the following:
Remove the air baffle.
If installed, remove the 4LFF midplane drive cage.
7.
Remove the heatsink blank.
8.
Use a T-20 Torx screwdriver to loosen the three captive screws in the sequence shown in the following image, and
then pivot the force frame upward.
9.
Remove the external cap:
a. Hold the lift tabs near the front end of the rail frame, and then pivot the rail frame to the vertical position.
b. Slide the external cap out of the rail frame.
Retain the external cap for future use.
Hardware options installation
95

Advertisement

Table of Contents
loading

Table of Contents