5.
Remove the primary riser cage.
6.
Remove the FlexibleLOM blank.
7.
Install the FlexibleLOM adapter.
8.
Install the riser cage.
9.
Install the access panel.
10. Install the server into the rack.
11. Connect the LAN segment cables.
12. Connect each power cord to the server.
Hardware options installation
131