The signal cables and power cords are routed through the front of the chassis. If you use power
cords that has a conductor cross-section area of a minimum of 16 sq mm (0.02 sq in), leave more
space between the front rack posts and the front door as appropriate.

Power supply

Make sure the power supply system at the installation site is stable and meets the requirements
of the power supplies, including the rated input voltage.
Select power supplies based on the power consumption of the cards and fan trays. For more
information about system power consumption and technical specifications of power supplies,
see H3C SR6604[6608] Routers Hardware Information and Specifications..

Installation accessories

Table1-7 Installation accessories
Grounding cable
M6 screws (provided
with the SR6608-DS
and user-supplied for
other router models)

Pre-installation checklist

Table1-8 Pre-installation checklist
Item
Installation site
Chassis dimensions
front
11 mm (0.43 in) for the grounding screw
at the chassis rear
ESD wrist strap
Cage nuts (provided
with the SR6608-DS
and user-supplied for
other router models)
Requirements
Ventilation
Temperature
0°C to 45°C (32°F to 113°F).
Relative humidity
10% to 95% (noncondensing).
Cleanliness
Rack requirements
Cable tie
There is a minimum clearance of 100 mm (3.94 in)
around the inlet and outlet vents for heat
dissipation of the router chassis.
A ventilation system is available at the installation
site.
Dust concentration ≤ 1.8 × 10
7
rear door
Mounting brackets
7
3
particles/m
.
Result