Download Print this page

Krick Sea Cruiser ARIADNE Building Instructions page 61

Advertisement

Available languages

Available languages

Now mark the position of the skylight on the
roof so that the cut-out can be trimmed. The
skylight is located on the mast side of the su-
perstructure.
Now glue the roof areas 65 onto the skylight.
In the last step glue the window frames 66.
Now the skylight can be stained, primed and
then varnished..
Status July 2019
65
Page 18
After painting, insert the window glasses in-
side. Now insert the brass nails part 153 into
the holes of the window frames.
Next you can filler and paint the roof.
Attach the sliding hatch from part 67 and 68 on
the other side of the roof. First stain, prime and
varnish the two parts as desired. Then first
glue part 67 with 5min epoxy onto the roof.
Afterwards part 68.
Now the two handrails 84 must be attached.
First drill the 1.5 mm holes in the handrails on
the supports for the later pinning. After stain-
ing, priming and varnishing, the handrails can
be attached to the roof with pins from part 85
and then fixed with thin super glue
.
In the last step glue the roof edging.
©
Krick Modelltechnik Knittlingen Germany

Advertisement

loading

This manual is also suitable for:

20380