Preparing For Installation - Tadiran Telecom Aeonix T200M Series Installation Manual

Hide thumbs Also See for Aeonix T200M Series:
Table of Contents

Advertisement

34
TEM Expansion Unit Description

Preparing for Installation

................................................................................................................
Inspect for Damage
1
Inspect the shipping carton for evidence of physical damage or mishandling
prior to opening.
2
Inspect all parts for damage.
3
Report any damage to the carrier immediately.
4
If it is necessary to make a damage claim to the carrier, do not move the
shipping carton until it has been examined by a representative of the carrier.
Once the module is fully assembled, it is no longer necessary to keep the empty
carton(s). Dispose of it in accord with local regulations.
Unpacking the Shipping Container
The following items should be present in the box containing the TEM:
Four (4) M2 screws for attaching the TEM unit to the phone
One (1) TEM unit including a DESI label inserted beneath the faceplate. In
addition, blank DESI labels can be purchased on Letter or A4 sized sheets.
T200M Series Installation Manual - Aeonix

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Aeonix T200M Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Aeonix t207mAeonix t208mAeonix t207m/npAeonix t208m/bl

Table of Contents