Installation And Start-Up; Safety Considerations - Ametek 241CE II User Manual

Hydrocarbon dewpoint analyzer
Hide thumbs Also See for 241CE II:
Table of Contents

Advertisement

This chapter describes how to install and safely start up the 241CE II
Hydrocarbon Dewpoint Analyzer.

Safety Considerations

PN 903-8797, Rev A

Installation and Start-Up

Read this entire section before beginning installation of the 241CE II
Analyzer. Failure to do so, and/or use of the analyzer in a manner not
specified in this manual, may impair the protection against fire, elec-
trical shock, and personal injury originally provided by this equipment.
Before beginning the installation of the analyzer and before powering
it up, review and follow all safety information in this chapter and fol-
lowing the Table of Contents near the beginning of this manual. This
information describes procedures to follow to avoid personal injury
and/or damage to the equipment. All regulatory agency and per-
sonnel safety procedures for your jurisdiction must be followed.
The installation of the analyzer must be in accordance with all of the
customer and local regulatory standards and procedures. There are no
operator-serviceable components inside the analyzer. Refer all servic-
ing to qualified personnel.
Under normal operating conditions, lethal concentrations toxic gases
from the sample stream may be present within the sample system. The
sample system is defined as all components in the analyzer system
through which sample gas passes.
A breathing apparatus must be worn when installing/removing equip-
ment from the sample gas extraction point. The sample stream is
under positive pressure, and injury or death from inhaling toxic gases
in the sample stream could result from attempting to install/remove
equipment without the use of a breathing apparatus.
Installation and Start-Up
|
2-1

Advertisement

Table of Contents
loading

Table of Contents