Sample System Leak Check - Ametek 241CE II User Manual

Hydrocarbon dewpoint analyzer
Hide thumbs Also See for 241CE II:
Table of Contents

Advertisement

Sample System Leak Check

The analyzer has been checked at the factory for pressure leaks. However, fit-
tings can loosen during transport, and the Sample, Vent, and Purge Gas Lines
are installed on-site. Therefore, the entire sample system should be checked for
leaks prior to powering up the analyzer for the first time, or following the re-
placement of any lines/fittings or Measuring Cell or Filterblock Assembly parts.
By introducing sample gas from the process stream into the sample system,
all connections within the sample system will be tested according to normal
operating conditions. Since the solenoid valve supplied with the analyzer is
normally closed (i.e., when not energized), this procedure will check all com-
ponents and connections from the process stream up to and including the
solenoid valve.
If the regulator is dialed in one-quarter of the way and the Bypass Valve is
opened, all of the analyzer's sample tubing will become pressurized even with
the Solenoid Valve closed (i.e., solenoid power is off ).
If the site has a shut-off valve on the Vent Line, close it. Otherwise, cap the Vent
Line at the end to let the sample system build up line pressure. Open the isola-
tion valve on the Sample Probe and perform the leak check.
PN 903-8797, Rev A
Do not apply power to the analyzer if there is damage (scratches,
indentations, or wear) to any flamepath (on the Electronics Enclosure
or Cell assembly). Applying power to an analyzer with a damaged
flamepath is dangerous and could result in serious injury or death,
or serious damage to equipment. See "Examining and Caring for the
Flamepaths" in Chapter 4.
Replace parts immediately if damage or wear is apparent. Contact
AMETEK if there is any doubt about the integrity of any flamepath.
Do not exceed the maximum working pressure rating of the sample
system – 13.8 MPa (2000 PSIG) – under any circumstances.
Do not exceed a Vent Line pressure of 344 KPAG (50 PSIG).
Installation and Start-Up
|
2-35

Advertisement

Table of Contents
loading

Table of Contents