INSTALLATION
This chapter shows you how to install your CG1000-RTP oxygen analyzer.
It includes the following:
•
Inspect Shipping Contents
•
Mechanical Installation
-
Sample gas requirements
-
Sample gas set-up
-
Calibration gas set-up
-
PPM measurement suggestions
•
Electrical Installation
-
Current output connections
-
Alarm contact connections
-
RS-232 communications
-
Select 115/230 Volt operation
•
Start-Up and User Interface
There are no operator-serviceable components inside the CG1000-
RTP. Never open the analyzer cover. Refer servicing to qualified
personnel.
Remove any packing material from the sensor and control unit. Check
for damage. If any damage is found, notify the shipper.
NOTE
|
Installation & Start-Up
3-1