System Messages - Ametek Dycor CG1000-RTP User Manual

Table of Contents

Advertisement

System Messages

Calibration Aborted
Calibration Required
If you see this message, select the Calibrate Key and perform a calibration. This message will not clear from the dis-
play by removing or restoring power to the analyzer.
Cal Verify Aborted
Primary Calibration
System Calibrating
System Verifying Cal
6-2 | Dycor CG1000-RTP Oxygen Analyzer
Calibration has been aborted by the user.
A regular calibration is required.
After a thermal calibration is performed you must always perform a regular
calibration.
During a thermal calibration the cell temperature is changed. A
system calibration cannot be performed for at least one hour. The
system calibration will determine the constants needed for the
Nernst equation.
The verification was successfully aborted by the system.
The system is performing a Primary Calibration. The message con-
tinues to be displayed during the one-hour recovery period after the
thermal calibration.
System calibration is in progress.
System verification is in progress.

Advertisement

Table of Contents
loading

Table of Contents