Chapter 3 Installation - Ametek Dycor CG1100 Series User Manual

Table of Contents

Advertisement

INSTALLATION
This chapter includes the following:
Mechanical Installation
-
Sample gas requirements
-
Sample gas set-up
-
Calibration gas set-up
-
PPM measurement suggestions
Electrical Installation
-
Wiring
-
Alarm contact connections
-
Output Wiring
-
Status LEDs and Alarms
-
Connection to Line Power
There are no operator-serviceable components inside the CG1100.
Never open the analyzer cover. Refer servicing to qualified personnel.
Remove any packing material from the sensor and control unit. Check
for damage. If any damage is found, notify the shipper.
NOTE
Installation | 3-1

Advertisement

Table of Contents
loading

Table of Contents