3.1 Installation place
Install place
This equipment is a structure that is installed in the panel and used.
Please choose and install the following places.
Place without vibration and impact. (Vibration:10
・
not allowed.)
Place where dust and oily smoke are few.
・
Place where ambient temperature doesn't exceed 0
・
change is a little.
Place where high radiant heat is not received directly.
・
Place where drop of water doesn't hang within the range of humidity 20
・
where dewfall is not done.
Place where circulation of air is good.
・
Place where space to be able to facilitate wiring, maintenance and
・
check, can be taken.
Place where electromagnetic radiation is not generated.
・
Place where doesn't include flammable gas, firedamp, causticity gas (SO
・
Place where machinery vibration is a little.
・
The inclination at the installation must not incline at the right and the
・
left, and it become the horizontal.
(Inclining forward 0°, Backward tilting 0
Install Panel
The installation panel is recommended to use the steel board whose thickness is 1.2 mm or more.
・
ounting panel can be used up to 7 mm thick at the maximum.
・M
3.2 Installation on panel
Please put and install appended panel packing between the Recorder and the panel.
Refer to Section 10.16 for externals size.
3. INSTALLATION
30°)
~
2
60Hz 0.2m/s
~
50℃, and place where temperature
~
3-1
Impact:The impact is
80%RH, and place
~
, H
S).
2
2
Need help?
Do you have a question about the TRM20A and is the answer not in the manual?