Supply control switch
11.3

Reconnection procedure

11.3.1 Normal reconnection process (Credit mode)

11.3.2 PIN protected reconnection process (Credit mode)

D000058620 en a – E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Issue 1.2
The meter typically requires manual intervention when the supply control
switch is to be switched on to reconnect the customer premises. This
involves following a sequence of instructions displayed on the LCD.
Two types of reconnection procedure can be supported
Normal reconnection process
PIN protected reconnection process
The steps below detail the normal reconnection process
1. Press button A briefly (< 2 s) from the default display.
All segments of the LCD are lit (display check).
export
import
£
2. Press button A briefly (< 2 s) from the all segment display.
The Credit mode status display will be shown.
C R P r e s s B f o r
import
import
3. Press button B briefly (< 2 s) from the credit status screen.
The Enable Supply display will be shown
E n a b l e
B =
y e s
4. Press and hold button B longer (≥ 2 s).
The customer premises are reconnected by switching on the supply
control switch. A reconnect message appears.
S u p p l y e n a b l e d
import
import
Where Pin protection has been enabled on the meter the following steps
are required to complete the reconnection process.
1.
Press button A briefly (< 2 s) from the default display.
All segments of the LCD are lit (display check).
export
import
£
Cents/
Pence/
E l e c
s u p p l y ?