Commissioning And Functional Check; Han Joining Process - Landis+Gyr E470 Series User Manual

Hide thumbs Also See for E470 Series:
Table of Contents

Advertisement

46/143
6.4

Commissioning and functional check

6.5

HAN joining process

© Landis+Gyr
Dangerous voltage on conductors
The mains fuses must be re-inserted before commissioning and functional
check of the meter. Therefore, if the terminal cover is not screwed tight,
there is a danger of contact with mains voltage at the connection terminals.
Prerequisites for commissioning and functional check
If no mains voltage is present, commissioning and functional check must be
performed later.
Connectivity via WAN to the DCC and supplier systems is assumed to be
available.
The installed meter should be commissioned into service and checked per
the following procedure:
1.
Check smart meter WAN coverage at install site.
2.
Install meter communications hub as per section 6.3.3.
3.
Insert the mains fuses removed for installation. The meter is powered
up in credit mode and the default display is initialised as shown below:
R a t e
X X A c t I m p
import
4.
The communications hub is also powered and joins WAN. The address
mappings are recorded on DCC system.
Utility sends command 'CCS01 – Add Device to CHF Device Log' to
5.
the communications hub, to allow the meter to join the HAN. This
command must contain the meter's MAC address, the install code for
the device and an active time period during which the meter must find
the HAN or the join will fail and the CCS01 command must be
repeated.
Dangerous voltage on conductors
The mains fuses must be re-inserted before commissioning and functional
check of the meter. Therefore, if the terminal cover is not screwed tight,
there is a danger of contact with mains voltage at the connection terminals.
Prerequisites for commissioning and functional check
If no mains voltage is present, commissioning and functional checks must
be performed later.
Connectivity via WAN to the DCC and supplier systems is assumed to be
available.
The meter should be installed and the terminal cover must in place.
D000058620 en a – E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Issue 1.2
0 0 0 0 0
kWh
Installation and Commissioning
Active import display