Landis+Gyr E470 Series User Manual page 45

Hide thumbs Also See for E470 Series:
Table of Contents

Advertisement

Installation and Commissioning
D000058620 en a – E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Issue 1.2
2.
Align the edges of the communication hub with the top of the main
meter body.
3.
Slide the communication hub along the guides positioned on top of the
meter to ensure that the two connection points are met.
4.
Continue to move the communications module towards the back of the
meter until no further movement is possible.
5.
Securely tighten, but do not overtighten, the communication hub fixing
screw following any guidance or instructions provided by the supplier
of the communications hub.
45/143
© Landis+Gyr

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 smets2

Table of Contents

Save PDF