Sign In
Upload
Manuals
Brands
Landis+Gyr Manuals
Measuring Instruments
3 SMETS2
User Manuals: Landis+Gyr 3 SMETS2 Smart Meter
Manuals and User Guides for Landis+Gyr 3 SMETS2 Smart Meter. We have
1
Landis+Gyr 3 SMETS2 Smart Meter manual available for free PDF download: User Manual
Landis+Gyr 3 SMETS2 User Manual (143 pages)
Brand:
Landis+Gyr
| Category:
Measuring Instruments
| Size: 2 MB
Table of Contents
Table of Contents
3
Safety
9
Safety Information
9
Responsibilities
9
Meter Operator Code of Practice
9
Safety Regulations
10
Compliance to SMETS2
11
Functional Overview
12
Main Characteristics
12
Technical Details
13
Type Designation
14
Metrological Functions
15
Clock Information
15
Accuracy
16
Date and Time
16
Validity
16
Daylight Saving Time
16
Deviation to GMT
17
Battery Backup
17
Operational Modes
17
Credit Mode
17
Prepayment Mode
18
Load Limiting
18
Customer Privacy PIN
19
Non-Disablement Calendar
19
Rolling Register Displays
19
Boost Function
19
Remote Commands
19
Environmental Performance
20
General Environment
20
Temperature and Humidity
20
Mechanical Strength of Meter Case
20
Physical Description
21
Meter Construction
21
Intimate Communications Hub Interface (ICHI)
22
Meter Faceplate
23
Control Elements
24
Metrology LED
24
LCD Display
24
Terminal Area
28
Connection Diagram
29
Auxiliary Load Control Switch Relay Output
29
Dimensions
30
Auxiliary Cable Strain Relief Method
30
Meter Displays
32
Display and Navigation Structure
32
Display Examples
32
Time Displays
32
Total Registers
32
Rate Registers
33
Instantaneous Values
34
Active Firmware Version
34
MID Displays
35
Charge Displays
35
Credit Mode Status Displays
35
Credit Mode Balance
35
Supply Armed Ready for Reconnection
35
Supply Disabled Due to Remote Disconnection
35
Customer PIN Enabled but Not Entered
36
Load Limit Exceeded
36
Prepayment Displays
36
Remaining Credit
36
Credit Low
36
Credit Exhausted and Emergency Credit Available
36
Emergency Credit Available with Remaining Credit
37
Emergency Credit Accepted
37
Emergency Credit Accepted but Not in Use
37
Emergency Credit Accepted and in Use
37
Emergency Credit Low and Owed
37
Emergency Credit Exhausted and Owed
38
Prepayment Displays with Active Non-Disablement
38
Emergency Credit in Use - Active Non-Disablement Period
38
Debt Management Displays
39
Payment Based Debt Displays
39
Time Based Debt Displays
39
Installation and Commissioning
41
Before Installation
41
Mounting the Meter
42
Connecting the Meter
43
Connecting the Phase and Neutral Connection Wires
43
Connecting a Separate Auxiliary Load Control Switch
44
Connecting the Intimate Communications Hub to the Meter
44
Commissioning and Functional Check
46
HAN Joining Process
46
Option 1 - Automatic Process (Recommended)
47
Option 2 - Manual HAN Join & Commissioning Process
49
HAN Join & Commissioning Steps
49
Meter Commissioned Check
52
Security Aspects
57
General
57
Tamper Protection
58
Sealing
58
Fraud Detection
58
Calendar Clock Accuracy and Settings
59
Security Log
59
Communication with Other Devices
59
Data Reconciliation
60
Unique Transaction Reference Number (UTRN)
60
Security Credentials
60
Energy Registers
61
Overview
61
Resolution
62
Accuracy
62
Total Energy Registers
62
Rated Energy Registers
62
Average and Maximum Demand
62
Configuration
64
Introduction
64
Default Hardware Configuration
64
Default Software Configuration
64
Prepayment Functionality
70
Prepayment Supply Control Switch Status Cycle
70
Accumulated Debt Register
70
OWED Register (Debt to Clear)
70
Credit Top Ups
71
Manual Entry of a Credit Top up Code
71
Emergency Credit
72
Credit Deductions from Prepaid Credit or Emergency Credit
73
Non-Disablement Calendar
73
Debt Management
74
Payment Based Debt Collection
74
Time Based Debt Collection
75
Suspend Debt Emergency
75
Suspend Debt Disabled Flag
76
Maximum Meter Balance
76
Supply Control Switch
77
Overview
77
Supply Control Switch States
78
Reconnection Procedure
79
Normal Reconnection Process (Credit Mode)
79
PIN Protected Reconnection Process (Credit Mode)
79
Reconnection When in Prepayment Mode
80
Load Limit Restoration Period
80
Customer Privacy PIN
81
PIN Entry Dialogue
82
PIN Edit Dialogue
83
Rolling Registers
84
Credit Mode
87
Display and Navigation Structure in Credit Mode
87
Top Level Display Structure - Credit Mode
88
Default Display
88
All Segment Display
89
Tariff Display List
89
PIN Entry
90
Credit Mode Status
91
Boost Function
92
ALCS Boost Support
93
Activating the Boost Period
94
Boost Activation Period
94
Currently Active Boost Period
94
Cancel Boost Period
94
Extending the Boost Period
94
Customer Menu
95
Manage PIN
96
View Event Log
97
View Power Log
97
Manage ALCS
97
Join HAN
97
Rolling Display List
97
Reconnect Supply Load Switch
98
Service Menu
98
In-Service Test Mode
99
Leave/Join HAN
100
Display Security Log
100
Exit Service Menu
100
Prepayment Mode
101
Display and Navigation Structure in Prepayment Mode
101
Overview
101
Top Level Display Structure - Prepayment Mode
102
Default Display
102
All Segment Display
103
Tariff Display List
103
PIN Entry
104
Prepayment Mode Status
105
Boost Function
107
ALCS Boost Support
108
Activating the Boost Period
108
Boost Activation Period
108
Currently Active Boost Period
108
Cancel Boost Period
108
Extending the Boost Period
108
Customer Menu
109
Manage PIN
110
View Event Log
111
View Power Log
111
Manage ALCS
111
Join HAN
111
Rolling Display List
111
Reconnect Supply Load Switch
112
Emergency Credit and Add Credit Dialogue
112
Emergency Credit Activation
112
Add Credit
113
Invalid / Already Used UTRN Entry
113
Service Menu
114
In-Service Test Mode
115
Leave/Join HAN
115
Display Security Log
115
Exit Service Menu
115
Load Limiting Operation
117
Load Limit Power Threshold
117
Load Limit Period
117
Load Limit State Change
117
Load Limit Restoration Period
117
Tariffs and Accounting
118
Tariff Structure in Credit and Prepayment Modes
118
Energy Accumulation
118
Current and Future Tariffs
118
Tariff Types
118
Tou Only Tariffs
119
Tou with Block Tariffs
119
Permitted Value Ranges for Rates and Blocks
120
Display of Pricing
120
Additional Tariff Related Data Items
121
Switching Calendar
121
Billing Calendar
121
Voltage Quality Measurements
122
Average RMS Voltage
122
Average RMS over Voltage
122
Average RMS under Voltage
122
RMS Extreme over Voltage
122
RMS Extreme under Voltage
123
RMS Voltage Sag Detection
123
RMS Voltage Swell Detection
123
Service Menu
124
Switching On/Off the In-Service Test Mode
124
Leaving/Joining HAN
125
Commissioned Indicator
125
Displaying Security Log Entries
126
Instantaneous Values
127
Profiles
128
Overview
128
Structure
128
Events and Alerts
129
Event Logs
129
Alerts
129
Power-Up/Power-Down Procedure
130
Power-Down (PD)
130
Bridging Time
130
Power-Down Procedure
130
Power-Up (PU)
131
Hardware Initialisation
131
Power-Up Procedure
131
Enable Communication
131
Behaviour of Outputs at PU/PD
132
Logging of Supply Interruption
132
Sending Consumer Messages
133
Maintenance and Service
134
Meter Check
134
Meter Testing
134
Measures in the Event of Faults
135
Operating Faults
135
Disconnecting the Meter
135
Triage
135
Repairing the Meter
137
Decommissioning and Disposal
138
Terms and Abbreviations
139
Acronyms
139
Units of Measurement
140
Index
141
Advertisement
Advertisement
Related Products
Landis+Gyr 2WR605
Landis+Gyr 2WR607
Landis+Gyr 2WR621
Landis+Gyr 2WR623
Landis+Gyr 2WR636
Landis+Gyr 2WR638
Landis+Gyr 750
Landis+Gyr Cashpower Gem Lite
Landis+Gyr CASHPOWER SABRE MK 5
Landis+Gyr Categories
Measuring Instruments
Control Unit
Conference System
Monitor
Power Tool
More Landis+Gyr Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL