Landis+Gyr E470 Series User Manual page 48

Hide thumbs Also See for E470 Series:
Table of Contents

Advertisement

48/143
Valid HAN
4
Network Found
Meter Notifies
Supplier
5
Systems of
Successful
Join
Supplier Issues
6
Commissioning
Request
Synchronise
7
Clock with
Comms Hub
Meter Notifies
Supplier
Systems of
8
Successful
Commissioning
Request
© Landis+Gyr
When the HAN
is found the
HAN signal
N/A
indicator is
shown on the
display
When the meter
joins the HAN it
SR8.11
notifies the
Supplier
I0 Response
systems via an
I0 Response
On receipt of an
I0 response a
commissioning
SR8.1.1
request is sent
to the meter
On successful
processing of
the
commissioning
request, the
SR8.1.1
meter will
synchronise
clocks with the
comms hub
When the meter
synchronises its
clock with the
SR8.1.1
comms hub, it
will notify the
I0 Response
Supplier
systems via an
I0 response
On successfully processing of SR8.1.1, the meter is commissioned and is
capable of being configured with Supplier, Premise and Customer specific
data via a series of commands issued as Service Requests from the
Supplier systems.
1.
Display and alerts
a. If the HAN signal indicator persists on the display following a
power cycle or HAN Join, then it means that the meter has
successfully completed certificate based key exchange (CBKE)
with the communications hub. If CBKE has not been completed,
then the symbol will disappear from the display following a
power cycle of the meter or HAN Join command. The signal
strength indicator bars provide a guide to the signal present at
the meter but do not give a calibrated indication of signal
strength.
b. On successful joining to the HAN the meter will immediately
send an alert (0x8F69) via its WAN interface (if the
organisational certificates in the meter are not registered to a
supplier then this will not happen and the commissioning will
cease at that point.)
D000058620 en a – E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Issue 1.2
R a t e
import
R a t e
import
R a t e
import
R a t e
import
R a t e
import
Installation and Commissioning
X X A c t I m p
0 0 0 0 0
kWh
X X A c t I m p
0 0 0 0 0
kWh
X X A c t I m p
0 0 0 0 0
kWh
X X A c t I m p
0 0 0 0 0
kWh
X X A c t I m p
0 0 0 0 0
kWh

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 smets2

Table of Contents