Connection Diagram; Auxiliary Load Control Switch Relay Output - Landis+Gyr E470 Series User Manual

Hide thumbs Also See for E470 Series:
Table of Contents

Advertisement

Physical description
4.7.1

Connection diagram

4.7.2

Auxiliary load control switch relay output

D000058620 en a – E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Issue 1.2
The following figure shows the connection diagram of the E470 meter.
Figure 8
Connection diagram
The connection diagram is provided on the inside of the terminal cover.
The E470 meter has a single auxiliary load control switch (ALCS) relay
output (terminals S1 and S2), for control of ancillary circuits such as off-
peak heating.
The ALCS relay output is located at the right side of the meter directly
above the main connection terminals (see Figure 6).
This output is a single pole voltage free non-latching relay rated at 230 V
2 A at unity and 0.5 pf.
The relay can be controlled by the following sources:
ALCS calendar (time of use, using scripts in the independently
controlled scheduler)
GBCS messages (sent from outside the meter via the DCC)
These options are shown in Figure 9.
There are no specific priorities on the sources concerning the control;
i.e. any new switch command, independent of its source, overrides the
previous one.
dlms communication
GBCS message
Output control unit
Figure 9
Output control unit
ALCS calendar
ALCS calendar table
Open/Close
230 VAC / 2 A
29/143
© Landis+Gyr