Activating The Boost Period; Boost Activation Period; Currently Active Boost Period; Cancel Boost Period - Landis+Gyr E470 Series User Manual

Hide thumbs Also See for E470 Series:
Table of Contents

Advertisement

94/143

14.8.2 Activating the boost period

14.8.3 Boost activation period

14.8.4 Currently active boost period

14.8.5 Cancel boost period

14.8.6 Extending the boost period

© Landis+Gyr
If the ALCS are boost enabled and are not controlled by the ALCS
calendar, then the meter will check whether a boost period is currently
active.
(Note if the ALCS are calendar controlled then the user is directed back to
the Customer Menu).
If the boost period is not currently active and does not require activation
then the A button should be selected. If the user wished to activate the
boost function, then the B button should be selected.
From the selection of the B button the user can define the active period in
the following manner;
User is presented with a 15-minute activation period – select B button to
accept or A button for further options.
User is presented with a 30-minute activation period – select B button to
accept or A button for further options.
User is presented with a 45-minute activation period – select B button to
accept or A button for further options.
User is presented with a 60-minute activation period – select B button to
accept or A button to cancel activation for further options. The user will then
be directed back to the customer menu.
On selection of a time option the boost function will be operational for the
selected time.
If a boost period is currently active the meter will determine whether the
current boost period duration is <60 minutes. If this is not the case, then the
user is directed back to the customer menu.
If the current boost period is less than 60 minutes, then the user can extend
the boost period.
The user can cancel an active boost period; from accessing the customer
menu the boost function is displayed select the B button, if the meter is in a
currently active boost period the user is directed to the cancel boost screen,
from this screen the user can select the B button to cancel the operation.
The user can extend the period of an active boost period in the following
manner; from accessing the customer menu the boost function is displayed
select the B button, if the meter is in a currently active boost period the user
is directed to the cancel boost screen, from the cancel boost screen select
the A button, the user is then directed to the Extend Boost screen, from this
screen select the B button.
The meter will then determine the time remaining for the current boost
selection and will present options associated with the current boost period,
as detailed below.
D000058620 en a – E470 Series 3 SMETS2 100 mm – ZCX310 – User Manual and Functional Description
Issue 1.2
Credit mode

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 smets2

Table of Contents