RGBlink D Series User Manual page 6

Presentation switcher & seamless scaler
Hide thumbs Also See for D Series:
Table of Contents

Advertisement

Unpacking and Inspection
Before opening D2 processor shipping box, inspect it for damage. If you find any damage, notify the
shipping carrier immediately for all claims adjustments. As you open the box, compare its contents
against the packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and checked that all the listed
components are present, visually inspect the system to ensure there was no damage during shipping. If
there is damage, notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your D2 should be clean, properly lit, free from static, and have
adequate power, ventilation, and space for all components.
5
D2
User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2

Table of Contents