wtw DIQ/S 182-MOD System Operating Manual page 44

Modular measuring system for 2 digital sensors with modbus rtu/rs 485 output
Table of Contents

Advertisement

Installation
Preparing the power
3 - 30
1
Cut off the cable to the required length.
cable
2
Strip the cable insulation for approx. 45 mm.
3
Bare the wires of phases L and N and fit them with wire end
sleeves.
4
If present, cut off the ground wire at the end of the cable
sheath.
Fig. 3-25 Prepared power cable.
Caution
The ground wire must not project into the enclosure. Otherwise,
malfunctions could occur.
approx. 45 mm
cut ground wire here
System 182
L
N
ba75504e07
04/2012

Advertisement

Table of Contents
loading

Table of Contents