wtw DIQ/S 182-MOD System Operating Manual page 27

Modular measuring system for 2 digital sensors with modbus rtu/rs 485 output
Table of Contents

Advertisement

System 182
Preparing the cable
Connecting the cables
ba75504e07
04/2012
1
Cut off the cable to the required length.
ends
2
Remove approx. 45 mm of cable insulation (in the case of the
SNCIQ/UG earth cable, remove both the inner and outer
insulation).
3
Only for the SNCIQ/UG earth cable:
strip the outer insulation for a further 35 mm.
4
Shorten the exposed shielding braid up to the cable sheath.
5
Shorten the two fillers (plastic inlays) up to the cable sheath.
6
Bare the red and green wires and fit them with wire end
sleeves.
7
Fit the filler stranded wire with a wire end sleeve.
SNCIQ
SNCIQ/UG
Fig. 3-11 Prepared cable end
The SNCIQ and SNCIQ/UG cables are connected to the terminal strip
in the same way as the SACIQ sensor connection cable (see
section 3.4.5):
1
Open the enclosure of the Universal Transmitter or
MIQ module.
2
Select a free SENSORNET connection. At the same time, look
out for the SENSORNET designation on the label on the
bottom of the enclosure.
approx. 35 mm
approx. 45 mm
approx. 45 mm
Installation
3 - 13

Advertisement