Oracle SPARC S7-2L Installation Manual page 45

Hide thumbs Also See for SPARC S7-2L:
Table of Contents

Advertisement

You hear an audible click when the slide rail locks are engaged.
Verify that the server is securely mounted in the rack and that the slide rail locks are
Caution -
engaged with the mounting brackets before you install the optional CMA.
(Optional) Attach the CMA.
6.
See
"Prepare the CMA for Installation" on page
If you are not using the CMA, see
Related Information
"Prepare the CMA for Installation" on page 47
"Attach the CMA to the Server" on page 49
"Verify Operation of Slide Rails and CMA" on page 55
Install the Server Into the Slide Rail Assemblies
47.
"Verify Operation of Slide Rails and CMA" on page
55.
Installing the Server
45

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC S7-2L and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents