Oracle SPARC S7-2L Installation Manual page 48

Hide thumbs Also See for SPARC S7-2L:
Table of Contents

Advertisement

Prepare the CMA for Installation
Note -
is shown in the following figures), and one cover with a single hinge.
Apply upward pressure to the outside edge of each hinge connector until the
b.
hinge connector comes off the hinge [(panel 3).
c.
Repeat
d.
One at a time, position each round cable cover horizontally over the hinges,
and align the hinge connectors with the hinges.
e.
Using your thumb, apply downward pressure on each hinge connector to
snap the hinge connector into place.
f.
Swing the cable covers down and press down on the cable cover handle to
lock them into the closed position.
48
SPARC S7-2L Server Installation Guide • June 2017
The CMA has two sets of three cable covers, two covers with two hinges (one of which
Step 4a
and
Step 4b
to remove all three cable covers.

Advertisement

Table of Contents
loading

Table of Contents