3.5 Control of Power Supply from a TemEBeam Controller (EBC)
Figure 3-7 Operations>E-Beam Screen, Beam on at 5% Power
3.5.5 Changing the HV Operating Level
If kV Control is set to Input Ctrl on the EBC's Config>E-Beam screen, you can change the
operating voltage of the HVPS at any time, regardless of whether the HV is on or off. To change
the kV value:
If the HV is on when you perform this procedure, the HVPS will begin operating at the new kV
value as soon as you touch the OK button. If the button is off, the HV will begin operating at
the new value the next time it is switched on.
3.5.6 Using the EBC's Diagnostics Screen
The EBC's Diagnostics screen (see Figure 3-7) enables you to monitor the operating status of
the power supply from the EBC screen. Functional definitions of this screen's PS-related LED
indicators appear below the screen illustration.
CV-12SLX User Manual
Step
Action
1
Touch the rectangle labeled kV Set to open a numeric keypad.
2
Use the keypad to enter the desired kV value.
3
Touch the keypad's Enter button to close it.

Figure 3-8 The EBC's Diagnostics Screen