3.6 Control of Power Supply by a PLC-Based System Controller
Figure 3-9 Remote Controller's LOCAL Screen, Menu 1 Selected, Beam and Sweep Off
Press to switch beam On/Off
3.6
Control of Power Supply by a PLC-Based System Controller
3.6.1 Switching Main Power On/Off
To switch on three-phase input power to the power supply, set the HVPS front-panel's main
power breaker to the ON position (i.e., all the way up). To switch off main input power, set the
main power breaker to the OFF position (i.e., all the way down).
CV-12SLX User Manual
Joystick. When Pwr Adjust is selected, push up/down to
increase/decrease beam power.
3-8
Section 3: Power Supply Operation
Press to select beam power control
as the joystick's function
0101-8292-0, Rev. C