Installation; Section Overview - ferrotec Temescal CV-12SLX User Manual

Table of Contents

Advertisement

2
2.1

Section Overview

This section describes the procedures required for installation the CV-12SLX power supply.
These units have the following top-level PNs:
0620-4210-0 (single-gun 208-volt CV-12SLX)
0620-4210-1 (single-gun 400-volt CV-12SLX)
0620-4210-2 (dual-gun 208-volt CV-12SLX)
0620-4210-3 (dual-gun 400-volt CV-12SLX)
The topics covered in this section are:
Section 2.2 List of Components and Cables Supplied with the Unit
Section 2.3 Rack Mounting the Power Module (HVPS)
Section 2.4 Mounting the Filament Power Supply Module(s)
Section 2.5 Grounding Requirements
Section 2.6 Cable Installation
Before beginning the installation procedure, make sure that the facility circuit breaker supplying
power to the CV-12SLX is switched OFF and locked out with an appropriate lockout/tagout device.
Also make sure that the FPS ON/OFF switch and the circuit breaker switch (labeled AC MAINS)
on the HVPS front panel are both in the OFF position. The facility breaker must remain locked and
tagged out during the entire installation procedure. Likewise, the power module's main circuit
breaker switch and the FPS ON/OFF switch must both remain in the OFF position during the
entire installation procedure. The power-up procedure (see section 3.4) specifies the exact
sequence in which power should be applied to the unit.
0101-8292-0, Rev. C
Section 2.6.1 Connecting the Input Power Cables
Section 2.6.2 Connecting the HV Coaxial Cable(s) (PN 0620-8684-1)
Section 2.6.3 Connecting the HV Output Conduit(s) (PN 0620-9654-1)
Section 2.6.4 Connecting the Control/Data Cables
Section 2.6.5 Making I/O Connections to the Vacuum System

Installation

CAUTION
2-1
CV-12SLX User Manual

Advertisement

Table of Contents
loading

Table of Contents